Nine fruit, one gentle look
Love, joy, peace, patience, kindness, goodness, faithfulness, gentleness and self-control, from Galatians 5:22-23.
Christian / Reflection · A Rafael Lima product
A gentle, private self-reflection on the nine fruit of the Spirit in Galatians 5:22-23.
In testing on Google Play
The product
Fruit of the Spirit Test is a private, offline-first Christian self-reflection based on Galatians 5:22-23: love, joy, peace, patience, kindness, goodness, faithfulness, gentleness and self-control. You answer 54 short statements about the last 30 days, six for each fruit, on a five-point scale from Never to Almost always. The result is a 0-100 index for each fruit, shown as a nine-leaf bloom, with a short reflection and a small practical step for each one. There is no overall score and no ranking. It is a tool for reflection, not a diagnosis, not a measure of your spiritual life and not a substitute for pastoral care or professional help.
Looking honestly at our own character can feel heavy, and many tools turn it into a score. Fruit of the Spirit Test asks a few short questions, shows each fruit on its own, and offers one small, practical step, without grading, ranking or judging you.
Adults and teens aged 13 and over who want a calm, honest moment of Christian self-reflection, on their own, in a small group or in conversation with a pastor or mentor.
Inside the product
A closer look at the interactions, visual system, and product decisions behind the application.
How it works
Think about the last 30 days and choose from Never to Almost always. You can stop and resume an unfinished test later.
Get a 0-100 index for each fruit, a short reflection and a small practical step. There is no overall score.
Optionally choose a focus fruit, then retest every 3 to 6 months and compare assessments in your history.
Product capabilities
Love, joy, peace, patience, kindness, goodness, faithfulness, gentleness and self-control, from Galatians 5:22-23.
Six statements for each fruit about the last 30 days, answered on a five-point scale from Never to Almost always. Some statements are phrased in reverse to keep answers honest.
A 0-100 index for each fruit with a short reflection and a small practical step. There is no overall score and no ranking of the fruit.
Each leaf is one fruit and its length follows your result, so you can see the whole picture at a glance.
Optionally choose a fruit to focus on, keep a history of your assessments with a chart, and compare any two of them. A retest is suggested every 3 to 6 months.
English, Portuguese (Portugal and Brazil), Spanish, German, French, Korean, Japanese, Russian and many more. It works without internet and needs no sign-up.
Availability
Fruit of the Spirit Test is in testing for Android and is not yet available on Google Play. The store link will appear here as soon as the listing is live. The app is not offered in every country.
No account is needed and the test works offline. Your results (the nine scores, the date and the language) are stored only on your device, and individual answers are not kept once a test is finished. The app is free and shows one small ad banner only on the History and About screens, after you have finished a test; ads and anonymous usage statistics run only after consent where the law requires it. See the full privacy policy for details.
Read the privacy policyQuestions
It is a private Christian self-reflection app based on Galatians 5:22-23. You answer 54 short statements about the last 30 days and see a result for each of the nine fruit of the Spirit, with a short reflection and a small practical step.
No. It is a tool for gentle reflection. It does not diagnose anything, does not measure your spiritual life and is not a substitute for pastoral care or professional help.
No. You see a 0-100 index for each fruit separately, shown as a nine-leaf bloom. The app does not give an overall score or rank the fruit.
Yes. No account is needed. Your results (the nine scores, the date and the language of each assessment) are stored only on your device and never leave it. Individual answers are not kept after a test is finished; only an unfinished test keeps its answers so you can resume it. You can delete any assessment, or all data, in the app.
The test works without an internet connection and is available in 34 languages, including English, Portuguese (Portugal and Brazil), Spanish, German, French, Korean, Japanese and Russian.
The app is free. It shows one small banner ad (Google AdMob) only on the History and About screens, and only after you have finished a test. There are no ads during the test, on results or on the home screen. Ads and anonymous usage statistics run only after your consent where the law requires it, and you can change your choice in About, Privacy choices.
It is made for people aged 13 and older. It is not directed to children.
Use the support page linked from this product page, or email contact@rafaelrglima.com.
Official resources
Help, contact details, and common questions.
How information is stored and handled.
The terms that apply to this product.
Designed and developed by Rafael Lima · View all products